This road has a very intense traffic, thousands of vehicles daily, including heavy, especially between downtown Molina de Segura and the hamlet of the brave, where the stretch Molina-La Alcayna, which serves thousands of residents , vehicles and businesses.
There are serious points of risk across the stage as the entrance to the road of urbanization El Pino, entry to school in Los Olivos, as well as many entrances and exits to roads and rural road safety must be guaranteed as the maximum.
The PSOE will ask for explanations of the delay permanent and immediate implementation required not to adversely affect road safety, communication and transport of vehicles and thousands of people daily.
The urban part of this road is already done, and the link with the A-30, the rotunda of Las Salinas, conducted by the Ministry of Public Works in 2008.
According to the PSOE, this delay seriously harms the interests of Molina de Segura and molinense.
Source: PSOE Molina de Segura