Unión Progreso y Democracia (UPyD) Molina de Segura contends that the local council for an explanation for the delay that has accumulated in the feasibility study should identify, on technical criteria, economic and environmental issues, what was the best route for the extension of Tram Line 1 from Murcia to Molina de Segura (the old railway Murcia-Caravaca or near the national highway 301).
This study, which was awarded by the Autonomous Region last November 2009, should be ready nine months later, and the mayor himself molinense, Eduardo Contreras, announced its presentation in mid-2010, which has not yet been produced today.
Source: UPyD Molina de Segura