Portal de Molina de Segura

www.portaldemolina.com

Molina de Segura - SpanishMolina de Segura - English
detail of Molina de Segura

 

The MARM repair the installation of chlorine dosing Station Drinking Water Treatment Campotéjar (31/10/2010)

These emergency works represent an investment of 128,326 euros.

The Government delegate, Rafael Gonzalez Tovar, announced today that at its last meeting, the Council of Ministers gave the go ahead for emergency works to the replacement of sewers, valves, evaporators and the installation of chlorine dosing station Potable Water Treatment (ETAP) Campotéjar in the town of Molina de Segura (Murcia).

On June 29 Campotéjar ETAP was damaged for which adopted an interim solution that ensured the supply to the municipalities that are supplied from it.

These emergency works, whose investment amounts to EUR 128,326, offer a final solution by implementing the following actions:

• Construction and assembly of liquid chlorine trap capture.

• Supply and installation of two chlorine evaporators.

• Construction and installation of a collector of chlorine gas in high pressure line.

• Construction and installation of a collector of chlorine gas in low pressure line.

• Supply and installation of emergency cutoff system automated lines of chlorine gas.

Source: Delegación del Gobierno en Murcia

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información