Portal de Molina de Segura

www.portaldemolina.com

Molina de Segura - SpanishMolina de Segura - English
detail of Molina de Segura

 

The districts of La Ribera and La Torrealta receive significant investments from the Participatory Budgets of Molina de Segura (26/11/2020)

| The Mayor has visited, today Thursday, November 26, the works carried out in both districts, such as the installation of shade sails children's play areas or improving road safety and public roads | The Molina de Segura City Council, through the Department of Public Roads, Municipal Works and Infrastructures, has carried out works and actions in the districts of La Torrealta and La Ribera, charged to the Participatory Budgets.

All of them have been visited, today Thursday, November 26, by the Mayor of the town, Esther Clavero Mira, and the Councilor for Public Roads, Municipal Works and Infrastructures, Fuensanta Martínez Jiménez. In La Torrealta they have visited the candle installation work in the playground located in the Social Center of this district.

Among the Participatory Budgeting actions, the installation of shade sails stands out, which has been carried out in a total of 7 children's play areas in the municipality: Los Conejos Urbanization. Next to the Carlos Soriano Museum in El Llano. La Rambla Park, in La Ribera. La Torrealta Social Center. Rambla de los Calderones. San Ignacio. San Antonio, on Avenida del Chorrico. The initial action, of 150,000 euros, was awarded for 114,208.96 euros and is fully completed. Next, the Mayor visited the improvement of the connection of the Greenway with the urban center of La Torrealta and stopping point, created with Participatory Budgets 2017, where, in addition, the connections of the Greenway in the downtown area were improved, in B ° de la Ermita, with an investment of 90,000 euros. Also in La Torrealta, the improvement of the pedestrian walkway between the Social Center and the CEIP Ntra.

Sra.

De los Remedios has been carried out, where an improvement of pavements has been made on an existing road next to the canal, which connects pedestrians La Torrealta with the Cabezo de los Lunas B °, providing children who enter the school with a pedestrian route from the Social Center.

The investment for this action was 21,847.34 euros. In the district of La Ribera de Molina, various works carried out under Participatory Budgets 2018 have been visited, such as: Road Safety improvements in the vicinity of the MU-560, in improving the pedestrian connection between the Plaza del Casino and the walk over the canal, and the improvements made to the walk itself.

The amount of this investment has been 24,704.86 euros. An action has also been carried out on Calle Sánchez Aguilar, with the completion of a first phase of improvement of pavements for an amount of 14,360 euros, and the shade sail installed in the Parque de la Rambla (Velas Projects) has been visited . Finally, the Mayor has informed the Pediatric and the Neighborhood Association of the presentation of the Projects of the District Plan 2020-2021, projects already under contract, which for this 2020 year includes the execution of various improvements in the Plaza del Casino and Plaza de la Calle Alvistur, as well as the execution of the first phase of the future Municipal Sports Pavilion of La Ribera, projects worth 28,411 and 321,026 euros, respectively (the latter with a municipal contribution of 127,848.36 euros).

Source: Ayuntamiento de Molina de Segura

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información